For long or heavy fabricated steel members, transport should be planned before the final dispatch date. A completed girder still needs a safe, documented path from the fabrication shop to the receiving point. The package may involve loading constraints, route considerations, delivery timing and site handling that affect both programme and cost.
Confirm the Delivery Boundary First
The purchase order should make clear whether the fabricator is responsible for packing and loading only, transport to a named destination, unloading support or a wider site-delivery scope. These are different obligations and should not be inferred from a single word such as “supply.”
Identification and Packing
Each dispatched member needs to remain identifiable when it reaches the site. Practical preparation may include member marks, packing lists, protection of surfaces and interfaces, and a loading plan that keeps the receiving sequence manageable. The exact packaging requirements should follow the project specification and the member's coating or finish.
Plan Loading Around the Actual Member
Length, weight, centre of gravity, lifting points and permitted handling method are package-specific. The dispatch plan should be aligned with the actual member configuration, not a generic transport assumption. For complex assemblies, confirm whether site-side temporary supports, lifting equipment or an agreed unloading sequence are required.
Check the Receiving Site
Delivery problems often begin at the destination. Before dispatch, the relevant parties should align on receiving access, unloading space, storage/staging area, delivery timing and the contact authorised to accept the material. This is especially important when members are being delivered into constrained industrial or rail-adjacent work areas.
Records at Release
The handover records required by the project may include packing lists, dispatch notes, identification details and the inspection documentation agreed in the quality plan. Keep the documentation boundary as clear as the physical delivery boundary.
Buyer Questions Before Release
- What exactly is included in the supplier's dispatch scope?
- How will each member be identified and protected?
- What loading and unloading assumptions are included?
- Is the receiving site ready for the planned delivery sequence?
- Which documents travel with the shipment and which are supplied separately?
Kothari's delivery model covers identification, protection, packing and loading for safe transport. Discuss the project-specific delivery boundary with the engineering team before release.