Kothari Chemicals (Engineering Division) lists a 195 MT, 24 m road over bridge package at Kusmunda in Chhattisgarh. The recorded scope includes studs and painting for South Eastern Coalfields Limited, with Jhajharia Nirman Limited identified as the client. The entry appears in the company's executed-work register and project portfolio.
Project snapshot
| Item | Recorded detail |
|---|---|
| Project | Kusmunda road over bridge |
| Location | Kusmunda, Chhattisgarh |
| Client | Jhajharia Nirman Limited |
| End user named in scope | South Eastern Coalfields Limited |
| Recorded span | 24 m |
| Quantity | 195 MT |
| Included scope | Studs and painting |
The executed-work register lists this as the 24 m span and records a separate 18 m Kusmunda package.

Define the bridge package at enquiry
For a similar project, send the general arrangement and current fabrication drawings with the member schedule. Identify the steel grades, joint details, connection items and any studs included in the supply. Distinguish shop work from site work and specify who supplies loose fasteners and other accessories. A clear scope lets the parties compare the required steelwork with the quantity and price basis.
Identify the design authority and any inspecting agency early. The drawing list should show revisions and the approval status of each document. If a connection or attachment depends on another contractor's work, agree who will confirm the interface and when that information will be available.
Plan inspection around the work
A project-specific quality plan can connect material identification, fit-up, welding, dimensional inspection and coating checks to the relevant drawings and acceptance criteria. Where an inspector must attend a stage, the plan should identify the notice, the release authority and the record to retain. Stud installation and inspection should follow the approved design, specification and procedure for that package.
Trial assembly, if required, should be defined in the contract and plan. Specify which members are to be assembled, which interfaces need checking and how the measurements will be recorded. Agree the required assembly records before scheduling the work.
Coordinate painting and dispatch
The project documents should identify the coating system, surface preparation, inspection requirements and any areas to be left uncoated for later work. Agree how coated members will be supported and protected during loading, transport and unloading. Mark each piece so the receiving team can relate it to the drawing and packing list.
For delivery planning, share the site access route, unloading equipment, storage space and desired erection sequence. Long or heavy pieces may need a separate transport and lifting review. Resolve the sequence with the fabricator and site team before dispatch so that components can be identified when they arrive.
Information to include in a similar request
- Approved drawings, member schedule and steel grade requirements.
- Scope of studs, fasteners, fabrication, coating and delivery.
- Inspection plan, required records and nominated inspection parties.
- Site access constraints, unloading arrangements and required delivery sequence.
See how hold, witness and review points work or send your bridge drawings and scope for a discussion.
- Kusmunda
- road over bridge
- bridge fabrication
- Chhattisgarh
About Kothari Chemicals (Engineering Division)
The Kothari Chemicals (Engineering Division) at Kothari Chemicals (Engineering Division) writes from day-to-day work in steel fabrication, quality assurance and project execution at the Bhilai works.
.jpg)